Your seven inputs
The fields below start with the Whitepaper’s illustrative figures, shown in yellow beside each input. They are placeholders from a worked scenario, not measured outcomes. Replace every one with your own.
Illustrative figures loaded
Control requirements and business units
These two figures describe the size of your environment. They are context only and are not used in the calculation.
Annual costs, effort reductions, ROI and estimated payback
Enter all seven required inputs to see results.
Hours first
Then dollars
Released capacity is not automatically a cash saving. Write down where the freed hours will go. The result covers ownership and governance administration only, and is an estimate to test, not a promise.
Five-year projection
Year-by-year costs, net savings and cumulative results. Dollar amounts are rounded to whole dollars.
| Cost element | Year 1 (transition) | Year 2 | Year 3 | Year 4 | Year 5 |
|---|
Legacy cost grows with wage inflation. Year 1 includes the transition overlap and one-time implementation. Licensing is indicative and held flat for illustration.
Sensitivity: conservative, base and optimistic
Steady-state effort is the least certain input until a pilot has produced your own figure. Test a range. The base case is your steady-state input above.
| Scenario | Steady-state hours | Annual labour cost | Total programme cost | Year 2 net saving |
|---|
Conservative and optimistic cases appear once you enter hours for them and all required inputs are complete.
Reporting, dashboards, audit support and regulatory change
Record your current effort in these areas. They are not part of the Whitepaper’s core model, so no saving is calculated and the figures are not added to the results above. The placeholders show the format only.
| Area | Hours per year | Cost at your labour rate |
|---|
Do not add these figures to the core results until you have validated each one. This section records effort. It does not claim a saving.
Current versus projected effort
Hours per year. Where the sensitivity cases are entered, they appear as separate bars. The second chart shows the cumulative net saving, which may start below zero.
Effort (hours per year)
Cumulative net saving ($)
Charts appear when all required inputs are complete. The tables above hold the same figures.
Contact information
Your name and work email are optional. You can use the calculator, download your results and print a summary without giving either.
Save to Eljay Infotech (optional)
Saving is separate from calculating and needs your explicit consent. If you do not tick the box, nothing leaves your browser.
Download your data and results
Both files are created in your browser and are never uploaded.
The PDF summary uses your browser’s print dialog. Choose “Save as PDF” as the destination.