eGRACS Solution Deployment Controls Triangle
This Tactical Tier control triangle seeks to manage the safe, controlled rollout of the information system into the production environment, ensuring minimal disruption and a clear plan for post-deployment support.
This control rolls down from the Deliver Solution Domain and cascades into: 2.3.2.1-Solution Rollout, 2.3.2.2-Solution BackOut, and 2.3.2.3-Solution Transition controls.
Control Mappings:
Cobit:2019 ➡️ BAI07; BAI07.01
ITIL:v4 ➡️ GM8; TM32